Pre-construction / Key West, Florida
Refrigeration design and field coordination
135 Duval Street · September 28, 2026 field photographs
Commercial refrigeration planning for Beer Church Brewing Company, including first-floor main and dough coolers and a third-floor cooler/freezer arrangement.
Current project stage
Planning before installation.
The pre-installation walkthrough documented proposed box locations, refrigeration routing, condenser mounting areas, overhead constraints, and access for delivery and staging.
These photographs show existing conditions and coordination areas. They do not show a completed CCS installation.
Field coordination
A practical installation plan.
Work with Samantha Jones Contractors, Inc. includes coordination of equipment locations, roof and wall mounting areas, line routing, and work interfaces with other trades.
Pre-construction photographs
Interior locations




Pre-construction photographs
Exterior equipment and mounting areas




Next chapter
Construction progress to follow.
New delivery, installation, and commissioning photographs can be added to this project as work advances.